com.vitorpamplona.amethyst/nestsClient/plans/2026-05-07-cross-stack-interop-ci-gating.md
Claude 6579b5f656 docs: audit, status-stamp, and index all module plans
Audited all 143 plan files across the 10 plans/ folders. Each plan now
carries a Status header (shipped | in-progress | queued | abandoned)
backed by codebase evidence, and every folder has a README.md index
grouping plans by status.

Shipped plans were moved into a per-folder plans/archive/ (via git mv,
history preserved) so each plans/ folder surfaces only live work:

  shipped (archived): 122   in-progress: 8   queued: 7   abandoned: 4

docs/plans/ is the frozen legacy folder; its plans were stamped and
indexed in place (48 of 52 archived) but it remains closed to new plans.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016hpUivtmq4pgzqRbY6MYrA
2026-06-30 15:35:38 +00:00

6.6 KiB
Raw Permalink Blame History

Plan: wire CI gating for the cross-stack interop suite

Status: queued — infra was wired (21947bc5) then DEFERRED/removed by maintainer over wallclock cost; kept in-tree as the ready-made target for a future CI-gating revisit. Audited 2026-06-30.

Status: ⏸ DEFERRED 2026-05-07. The infrastructure to wire CI is ready — both jobs landed in commit 21947bc5 and a 10/10 stability sweep × 22 tests = 220/220 passed on the agent rig. A maintainer review then judged the wallclock cost too high for the change-pattern and removed the jobs (cold cache: ~10 min hang, ~13 min browser; most PRs don't touch audio / MoQ / QUIC).

The suites are now run manually before merging changes that touch the relevant code paths. Developer-facing docs: ../tests/README.md. This plan stays in the tree for the next time someone wants to revisit CI gating — the YAML shapes below are the exact reverse-merge target, and the stability bar (10/10 sweep) has already been demonstrated on this branch.

Depended on:

  • 2026-05-07-moq-relay-routing-investigation.md closed ()
  • 2026-05-07-tighten-cross-stack-assertions.md closed ()
  • 10/10 sweep stability verified ()

What's needed

A) .github/workflows/build.yml — the hang-interop job

The job was originally part of this branch but removed per maintainer ask in commit 6829ab727 ("ci(nests): drop hang-interop job from build.yml") because the suite was flaky. Resurrect the exact same shape:

hang-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    - uses: actions/checkout@v6
    - uses: actions/setup-java@v5
      with: { distribution: 'zulu', java-version: 21 }
    - uses: gradle/actions/setup-gradle@v4
      with:
        cache-read-only: ${{ github.ref != 'refs/heads/main' }}
    - uses: dtolnay/rust-toolchain@stable
    - uses: actions/cache@v4
      with:
        path: |
          ~/.cargo/registry
          ~/.cargo/git
          nestsClient/tests/hang-interop/target
          ~/.cache/amethyst-nests-interop/hang-interop-cargo
        key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
        restore-keys: |
          ${{ runner.os }}-cargo-
    - name: Run cross-stack interop suite
      run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Hang Interop Test Reports
        path: nestsClient/build/reports/tests/jvmTest/

The git show 6829ab727 -- .github/workflows/build.yml reverse gives the exact diff to re-add. Linux-only is correct: the cargo install of moq-relay 0.10.x has nontrivial native deps (aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s. macOS / Windows would double matrix cost without catching new defects.

B) .github/workflows/build.yml — the browser-interop job

Same shape as A, plus bun + Playwright caching:

browser-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    # ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
    - uses: oven-sh/setup-bun@v2
      with: { bun-version: 1.3.11 }
    - uses: actions/cache@v4
      with:
        path: |
          nestsClient/tests/browser-interop/node_modules
          nestsClient/tests/browser-interop/dist
        key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
    - uses: actions/cache@v4
      with:
        path: ~/.cache/ms-playwright
        key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
    - name: Run browser cross-stack interop suite
      run: |
        ./gradlew :nestsClient:jvmTest \
            --tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
            -DnestsHangInterop=true \
            -DnestsBrowserInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Browser Interop Test Reports
        path: |
          nestsClient/build/reports/tests/jvmTest/
          nestsClient/tests/browser-interop/test-results/
          nestsClient/tests/browser-interop/playwright-report/

Same git show b94737de7 -- .github/workflows/build.yml reverse gives the exact diff (feat/nests-browser-interop's removal commit).

The existing nests-interop opt-in pattern already lives in cli/tests/nests/nests-interop.sh. Confirm both new jobs run in parallel with that without resource contention. They use different ports (NativeMoqRelayHarness reserves ServerSocket(0)) so they're independent at the network level.

Stability bar — verified

for i in 1..10; do
  ./gradlew :nestsClient:jvmTest \
    --tests HangInteropTest --tests BrowserInteropTest \
    -DnestsHangInterop=true -DnestsBrowserInterop=true --rerun-tasks
done

Result: 10/10 BUILD SUCCESSFUL × 22 tests = 220/220 pass. ~5m 28s steady state per sweep on the agent rig.

CI runtime budget

  • Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s long-broadcast scenario dominates), ~8 min cold (cargo install moq-relay).
  • Browser-interop job: ~5-7 min warm (Chromium boot × N scenarios), ~10 min cold (Playwright install).
  • Both run in parallel after lint.

Total CI overhead: ~5-10 min on the critical path beyond the existing build matrix. Acceptable.

Documentation updates

After CI is green:

  1. nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md — replace the "CI integration: Not wired" section with "wired, tracking flake-rate at 0/N runs".
  2. nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md — replace #6 CI integration: ⏸ deferred with ✅ live.
  3. Pick a maintainer to monitor the first 2 weeks of CI runs and bisect any new flake immediately (don't let it accumulate as "known flake" again).

Acceptance criteria

  • Both jobs added to build.yml and merge to main.
  • 10/10 sweep before merge.
  • First 2 weeks post-merge: ≥ 95% green rate. If lower, the routing investigation isn't really done — pull the jobs again until it is.

Optional follow-ups

  • Add I-12 GOAWAY scenario IF an IETF moq-transport target lands. Currently N/A in moq-lite-03 per cross-stack-interop-test-results.md's I12 section. If an IETF target ever ships, this is the cross-stack regression test.
  • Surface framesPerGroup as a per-deployment config if the framesPerGroup-rerun outcome shows the two rigs can't converge (see 2026-05-07-framespergroup-production-rerun.md).